Dike reinforcement & infrastructure

Settlement monitoring for dike and infrastructure works

Automated measurements from multiple settlement gauges along a linear work zone.

Spot ONE on a settlement gauge beside a construction site

The project challenge

Linear infrastructure and dike projects often use many settlement gauges. Manual surveying requires access to every point. This takes planning and travel time.

The approach

Spot ONE is mounted on existing settlement gauges. The measurement interval is configured for the project phases. Results are sent automatically to the online platform.

The project team sees monitoring locations and settlement trends in one overview. Data can be exported for analysis and reporting.

The practical result

Fewer manual survey rounds are required. New measurements are available sooner. This supports planning for subsequent work.

This profile describes a typical application. Customer-specific results are only published after approval.