Dike reinforcement & infrastructure
Settlement monitoring for dike and infrastructure works
Automated measurements from multiple settlement gauges along a linear work zone.

The project challenge
Linear infrastructure and dike projects often use many settlement gauges. Manual surveying requires access to every point. This takes planning and travel time.
The approach
Spot ONE is mounted on existing settlement gauges. The measurement interval is configured for the project phases. Results are sent automatically to the online platform.
The project team sees monitoring locations and settlement trends in one overview. Data can be exported for analysis and reporting.
The practical result
Fewer manual survey rounds are required. New measurements are available sooner. This supports planning for subsequent work.
This profile describes a typical application. Customer-specific results are only published after approval.